
| NASA Center: |
Kennedy Space Center |
| Image # : |
96PC-0852 |
| Date : |
6/24/1996
|
|---|
|
Title
STS-79 Rollout
Full Description
A vantage point high atop the Vehicle Assembly Building (VAB) shrinks the size
and scale of the orbiter Atlantis as it is rolled from the Orbiter Processing
Facility to the VAB. During the five working days it spends inside the huge
building, Atlantis will be mated to the external tank/twin solid rocket booster
assembly, and then rolled out to Launch Pad 39A.
In the VAB, the SPACEHAB Double Modules will be installed in the orbiter's
payload bay and final launch preparations will get under way. Atlantis is
scheduled for liftoff on Mission STS-79, the fourth docking with the Russian
Space Station Mir, on July 31.
Keywords
Atlantis STS-79 Rollout
Subject Category
Space Shuttle,
Reference Numbers
- Center:
KSC
- Center Number:
96PC-0852
- GRIN DataBase Number:
GPN-2000-000867
Source Information
- Creator/Photographer: NASA
- Original Source: DIGITAL
| Resolution | Format | Width (Pixels) | Height (Pixels) | Size (KBytes) |
Thumbnail |
.jpg |
90 |
60 |
12 |
Small |
.jpg |
640 |
427 |
442 |
Medium |
.jpg |
1500 |
1000 |
2,135 |
Large |
.jpg |
3000 |
2000 |
7,262 |
Other relevant NASA Web sites:
NASA Headquarters
NASA History Office
NASA Image eXchange (NIX)
NASA Multimedia Gallery
NASA Human Spaceflight
Updated October 31, 2002
History Questions: NASA History Office
Responsible NASA Official: Steve Garber
Author: Michael Hahn. Editor: Dwayne A. Day
Curator & Technical Questions: Erin Needham
NASA's Privacy Statement
|